Construction Update June 3, 2026

Solana – Spring 2026 Construction Update

New Condos in Willoughby, Langley

Construction at SOLANA has officially gone vertical. Structural work is actively underway, and the building is rising above grade, a significant step forward on the path to delivering new homes. Completion remains targeted for Spring 2027.

 

▶︎ Watch Construction Update

June 2026 Construction Highlights

Framing for both buildings A and B is now complete, and both tower cranes have been dismantled. On Building A, siding and brickwork are underway while drywall and interior rough-ins are in full swing. Building B has reached its own milestone: windows are installed, exterior work is beginning, and drywall is getting underway with momentum building quickly. In the parkade, rough-ins are ongoing and wall and column painting has begun. On the west road, exterior landscape walls are being formed and finished. Each of these milestones brings us one step closer to delivering these new homes in Willoughby.

About SOLANA – New Condos in Willoughby

Located at 76th Ave and 200th St in Willoughby, SOLANA is steps from Langley Events Centre and RE Mountain Secondary School, with shops nearby and Highway 1 just three minutes away. The Fraser Highway Bus Rapid Transit line is within walking distance, connecting residents from Maple Ridge through Langley and onward to the future Surrey-Langley SkyTrain extension, putting Vancouver within easy reach.

Solana offers brand-new pre-sale condos offer 1 and 2 bedroom homes in Langley with 9-foot ceilings, air conditioning, built-in closet organizers, in-suite washer/dryer, and a storage locker. Every parking stall includes EV rough-in for electric vehicle charging. Most homes feature a kitchen island alongside full-size stainless steel appliances, a 5-burner gas range, dishwasher, and seamless full-slab backsplash, plus a gas BBQ hookup on the balcony.

Beyond your front door, SOLANA offers over 2 acres of park space and 90,000 square feet of combined indoor and outdoor amenities. Spend time in the landscaped gardens, let the dog loose at the dog park, challenge a neighbour to pickleball, bocce, or table tennis, practice your short game at the putting green, or unwind in the sun lounge. There are also playgrounds, built-in BBQ areas, and more.

Limited homes remain at Solana. Get in touch with our sales team to learn more about availability, pricing and to tour the Solana showhome at 190 Willoughby Town Centre Drive, open daily 12 to 5 PM (closed Fridays).

 

Solana is Expected to be Completed in Spring 2027

FAQ:

Where is SOLANA located?
Solana is located in Willoughby, Langley at 19958 77 Avenue.

When will SOLANA be completed?
Solana is estimated to be completed in Spring 2027.

What amenities does SOLANA offer?
Solana offers over 2 acres of park space and 90,000 square feet of combined indoor and outdoor amenities including greenspace, landscaped gardens, dog park, a pickleball court, bocce court, table tennis, putting green, sun lounge area, built-in BBQ area, playgrounds and more.

How much deposit is required to purchase at SOLANA?
Purchase a home at Solana with only a 5% deposit.

Are parking stalls EV-ready at SOLANA?
Yes, all parking stalls at Solana come with EV rough-in for electric car charging.

Learn more about Solana, new condos in Willoughby, Langley